New Construction LNG Terminal Dunkerque (Dunkirk)

  • Client EDF Group, Fluxys Group, Total Group
  • Contractor Joint venture EMCC – GEKA Bouw
  • Work Dunkerque LNG Terminal, France
  • Date Mei – juni 2014

For Dunkerque LNG (Liquefied Natural Gas) Terminal, the second largest construction site and LNG storage capacity in France, Martens produced under very tight deadlines 76 columns, 55 beams and 57 slabs for the joint venture EMCC - GEKA Bouw.

These customized precast concrete products meet the highest maritime environment applicable requirements, as galvanized reinforcement.

Under direction of Martens the columns, beams and slabs were transported from the production site in Oosterhout to the terminal in Dunkirk.