Lift pits for Apartments Westdijk Zuidoost Cluster 8 Amstelveen (project Greencourt)

  • Client Ontwikkelingscombinatie WWZO c.v.
  • Work Amstelveen
  • Date Januari 2013

In this lift pits of Martens provisions are made to connect the reinforcement to the adjacent structure.

From the outside concrete beams will be poured against the lift pits. The lift pits are part of the structure of the building.

Dimensions:

  • 4 lift pits two-spanner, internally 1700mm x 2600mm x 960mm, wall 425mm.
  • 2 lift pits three-spanner, internally 1700mm x 2710mm x 1150mm, wall 300-400mm.